(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-91116664-1', 'auto'); ga('send', 'pageview');

Ramirez Family Foundation

K4-12 private choice school adding new $49 million school building.

One of Milwaukee’s biggest and highest-performing schools is about to become substantially larger.

As featured in Urban Milwaukee

St. Augustine Preparatory Academy will open its new, $49 million elementary school building this fall, making the relatively new K4-12 school the largest single-campus school in the city.

The private choice school, located at the intersection of S. 6th Street and W. Harrison Avenue in the Lincoln Village neighborhood, will be capable of housing 2,400 students across its elementary and high school buildings. A four-year growth plan aims to fill the campus.

“This next year, we are adding one class per grade level, with the exception of fifth grade, where we already had so many students on the wait list we actually have two,” said CEO Abby Andrietsch on a tour of the construction site. An additional round of classes will be added in the 2025-26 school year, with a plan of five classes per grade level and an elementary student body of 825 to 850.

The school opened in 2017 as a high school and for the last three years St. Augustine has operated with K4-12 students all in one building. The new building will result in space for each grade level to grow, in part by freeing up space in the existing 225,000-square-foot building. It will also allow Augustine Prep to augment the numerous athletic facilities in the high school with a number of art facilities in the new building.

Read full article here.